mirror of
https://github.com/Dasharo/linux.git
synced 2026-03-06 15:25:10 -08:00
There is no need to hold the crypto mutex when scheduling a self- test. In fact prior to the patch introducing asynchronous testing, this was done outside of the locked area. Move the crypto_schedule_test call back out of the locked area. Also move crypto_remove_final to the else branch under the schedule- test call as the list of algorithms to be removed is non-empty only when the test larval is NULL (i.e., testing is disabled). Signed-off-by: Herbert Xu <herbert@gondor.apana.org.au>
24 KiB
24 KiB