We always use resched_task() with rq->curr argument.
It's not possible to reschedule any task but rq's current.
The patch introduces resched_curr(struct rq *) to
replace all of the repeating patterns. The main aim
is cleanup, but there is a little size profit too:
(before)
$ size kernel/sched/built-in.o
text data bss dec hex filename
155274 16445 7042 178761 2ba49 kernel/sched/built-in.o
$ size vmlinux
text data bss dec hex filename
7411490 1178376 991232 9581098 92322a vmlinux
(after)
$ size kernel/sched/built-in.o
text data bss dec hex filename
155130 16445 7042 178617 2b9b9 kernel/sched/built-in.o
$ size vmlinux
text data bss dec hex filename
7411362 1178376 991232 9580970 9231aa vmlinux
I was choosing between resched_curr() and resched_rq(),
and the first name looks better for me.
A little lie in Documentation/trace/ftrace.txt. I have not
actually collected the tracing again. With a hope the patch
won't make execution times much worse :)
Signed-off-by: Kirill Tkhai <tkhai@yandex.ru>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Randy Dunlap <rdunlap@infradead.org>
Cc: Steven Rostedt <rostedt@goodmis.org>
Link: http://lkml.kernel.org/r/20140628200219.1778.18735.stgit@localhost
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Pull more scheduler updates from Ingo Molnar:
"Second round of scheduler changes:
- try-to-wakeup and IPI reduction speedups, from Andy Lutomirski
- continued power scheduling cleanups and refactorings, from Nicolas
Pitre
- misc fixes and enhancements"
* 'sched-core-for-linus' of git://git.kernel.org/pub/scm/linux/kernel/git/tip/tip:
sched/deadline: Delete extraneous extern for to_ratio()
sched/idle: Optimize try-to-wake-up IPI
sched/idle: Simplify wake_up_idle_cpu()
sched/idle: Clear polling before descheduling the idle thread
sched, trace: Add a tracepoint for IPI-less remote wakeups
cpuidle: Set polling in poll_idle
sched: Remove redundant assignment to "rt_rq" in update_curr_rt(...)
sched: Rename capacity related flags
sched: Final power vs. capacity cleanups
sched: Remove remaining dubious usage of "power"
sched: Let 'struct sched_group_power' care about CPU capacity
sched/fair: Disambiguate existing/remaining "capacity" usage
sched/fair: Change "has_capacity" to "has_free_capacity"
sched/fair: Remove "power" from 'struct numa_stats'
sched: Fix signedness bug in yield_to()
sched/fair: Use time_after() in record_wakee()
sched/balancing: Reduce the rate of needless idle load balancing
sched/fair: Fix unlocked reads of some cfs_b->quota/period
Sometimes ->nr_running may cross 2 but interrupt is not being
sent to rq's cpu. In this case we don't reenable the timer.
Looks like this may be the reason for rare unexpected effects,
if nohz is enabled.
Patch replaces all places of direct changing of nr_running
and makes add_nr_running() caring about crossing border.
Signed-off-by: Kirill Tkhai <tkhai@yandex.ru>
Acked-by: Frederic Weisbecker <fweisbec@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/20140508225830.2469.97461.stgit@localhost
Signed-off-by: Ingo Molnar <mingo@kernel.org>
{inc,dec}_rt_tasks() used to count entities which are directly queued
on the rt_rq. If an entity was not a task (i.e., it is some queue), its
children were not counted.
There is no problem here, but now we want to count number of all tasks
which are actually queued under the rt_rq in all the hierarchy (except
throttled rt queues).
Empty queues are not able to be queued and all of the places, which
use ->rt_nr_running, just compare it with zero, so we do not break
anything here.
Signed-off-by: Kirill Tkhai <tkhai@yandex.ru>
Reviewed-by: Preeti U Murthy <preeti@linux.vnet.ibm.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1394835289.18748.31.camel@HP-250-G1-Notebook-PC
Cc: linux-kernel@vger.kernel.org
[ Twiddled the changelog. ]
Signed-off-by: Ingo Molnar <mingo@kernel.org>
1) Single cpu machine case.
When rq has only RT tasks, but no one of them can be picked
because of throttling, we enter in endless loop.
pick_next_task_{dl,rt} return NULL.
In pick_next_task_fair() we permanently go to retry
if (rq->nr_running != rq->cfs.h_nr_running)
return RETRY_TASK;
(rq->nr_running is not being decremented when rt_rq becomes
throttled).
No chances to unthrottle any rt_rq or to wake fair here,
because of rq is locked permanently and interrupts are
disabled.
2) In case of SMP this can cause a hang too. Although we unlock
rq in idle_balance(), interrupts are still disabled.
The solution is to check for available tasks in DL and RT
classes instead of checking for sum.
Signed-off-by: Kirill Tkhai <ktkhai@parallels.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1394098321.19290.11.camel@tkhai
Signed-off-by: Ingo Molnar <mingo@kernel.org>
The problems:
1) We check for rt_nr_running before call of put_prev_task().
If previous task is RT, its rt_rq may become throttled
and dequeued after this call.
In case of p is from rt->rq this just causes picking a task
from throttled queue, but in case of its rt_rq is child
we are guaranteed catch BUG_ON.
2) The same with deadline class. The only difference we operate
on only dl_rq.
This patch fixes all the above problems and it adds a small skip in the
DL update like we've already done for RT class:
if (unlikely((s64)delta_exec <= 0))
return;
This will optimize sequential update_curr_dl() calls a little.
Signed-off-by: Kirill Tkhai <ktkhai@parallels.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Cc: Juri Lelli <juri.lelli@gmail.com>
Link: http://lkml.kernel.org/r/1393946746.3643.3.camel@tkhai
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Michael spotted that the idle_balance() push down created a task
priority problem.
Previously, when we called idle_balance() before pick_next_task() it
wasn't a problem when -- because of the rq->lock droppage -- an rt/dl
task slipped in.
Similarly for pre_schedule(), rt pre-schedule could have a dl task
slip in.
But by pulling it into the pick_next_task() loop, we'll not try a
higher task priority again.
Cure this by creating a re-start condition in pick_next_task(); and
triggering this from pick_next_task_{rt,fair}().
It also fixes a live-lock where we get stuck in pick_next_task_fair()
due to idle_balance() seeing !0 nr_running but there not actually
being any fair tasks about.
Reported-by: Michael Wang <wangyun@linux.vnet.ibm.com>
Fixes: 38033c37fa ("sched: Push down pre_schedule() and idle_balance()")
Tested-by: Sasha Levin <sasha.levin@oracle.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Cc: Juri Lelli <juri.lelli@gmail.com>
Cc: Steven Rostedt <rostedt@goodmis.org>
Link: http://lkml.kernel.org/r/20140224121218.GR15586@twins.programming.kicks-ass.net
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Kirill Tkhai noted:
Since deadline tasks share rt bandwidth, we must care about
bandwidth timer set. Otherwise rt_time may grow up to infinity
in update_curr_dl(), if there are no other available RT tasks
on top level bandwidth.
RT task were in fact throttled right after they got enqueued,
and never executed again (rt_time never again went below rt_runtime).
Peter then proposed to accrue DL execution on rt_time only when
rt timer is active, and proposed a patch (this patch is a slight
modification of that) to implement that behavior. While this
solves Kirill problem, it has a drawback.
Indeed, Kirill noted again:
It looks we may get into a situation, when all CPU time is shared
between RT and DL tasks:
rt_runtime = n
rt_period = 2n
| RT working, DL sleeping | DL working, RT sleeping |
-----------------------------------------------------------
| (1) duration = n | (2) duration = n | (repeat)
|--------------------------|------------------------------|
| (rt_bw timer is running) | (rt_bw timer is not running) |
No time for fair tasks at all.
While this can happen during the first period, if rq is always backlogged,
RT tasks won't have the opportunity to execute anymore: rt_time reached
rt_runtime during (1), suppose after (2) RT is enqueued back, it gets
throttled since rt timer didn't fire, replenishment is from now on eaten up
by DL tasks that accrue their execution on rt_time (while rt timer is
active - we have an RT task waiting for replenishment). FAIR tasks are
not touched after this first period. Ok, this is not ideal, and the situation
is even worse!
What above (the nice case), practically never happens in reality, where
your rt timer is not aligned to tasks periods, tasks are in general not
periodic, etc.. Long story short, you always risk to overload your system.
This patch is based on Peter's idea, but exploits an additional fact:
if you don't have RT tasks enqueued, it makes little sense to continue
incrementing rt_time once you reached the upper limit (DL tasks have their
own mechanism for throttling).
This cures both problems:
- no matter how many DL instances in the past, you'll have an rt_time
slightly above rt_runtime when an RT task is enqueued, and from that
point on (after the first replenishment), the task will normally execute;
- you can still eat up all bandwidth during the first period, but not
anymore after that, remember that DL execution will increment rt_time
till the upper limit is reached.
The situation is still not perfect! But, we have a simple solution for now,
that limits how much you can jeopardize your system, as we keep working
towards the right answer: RT groups scheduled using deadline servers.
Reported-by: Kirill Tkhai <tkhai@yandex.ru>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Cc: Steven Rostedt <rostedt@goodmis.org>
Link: http://lkml.kernel.org/r/20140225151515.617714e2f2cd6c558531ba61@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Dan Carpenter reported:
> kernel/sched/rt.c:1347 pick_next_task_rt() warn: variable dereferenced before check 'prev' (see line 1338)
> kernel/sched/deadline.c:1011 pick_next_task_dl() warn: variable dereferenced before check 'prev' (see line 1005)
Kirill also spotted that migrate_tasks() will have an instant NULL
deref because pick_next_task() will immediately deref prev.
Instead of fixing all the corner cases because migrate_tasks() can
pass in a NULL prev task in the unlikely case of hot-un-plug, provide
a fake task such that we can remove all the NULL checks from the far
more common paths.
A further problem; not previously spotted; is that because we pushed
pre_schedule() and idle_balance() into pick_next_task() we now need to
avoid those getting called and pulling more tasks on our dying CPU.
We avoid pull_{dl,rt}_task() by setting fake_task.prio to MAX_PRIO+1.
We also note that since we call pick_next_task() exactly the amount of
times we have runnable tasks present, we should never land in
idle_balance().
Fixes: 38033c37fa ("sched: Push down pre_schedule() and idle_balance()")
Cc: Juri Lelli <juri.lelli@gmail.com>
Cc: Ingo Molnar <mingo@kernel.org>
Cc: Steven Rostedt <rostedt@goodmis.org>
Reported-by: Kirill Tkhai <tkhai@yandex.ru>
Reported-by: Dan Carpenter <dan.carpenter@oracle.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/20140212094930.GB3545@laptop.programming.kicks-ass.net
Signed-off-by: Thomas Gleixner <tglx@linutronix.de>
This patch both merged idle_balance() and pre_schedule() and pushes
both of them into pick_next_task().
Conceptually pre_schedule() and idle_balance() are rather similar,
both are used to pull more work onto the current CPU.
We cannot however first move idle_balance() into pre_schedule_fair()
since there is no guarantee the last runnable task is a fair task, and
thus we would miss newidle balances.
Similarly, the dl and rt pre_schedule calls must be ran before
idle_balance() since their respective tasks have higher priority and
it would not do to delay their execution searching for less important
tasks first.
However, by noticing that pick_next_tasks() already traverses the
sched_class hierarchy in the right order, we can get the right
behaviour and do away with both calls.
We must however change the special case optimization to also require
that prev is of sched_class_fair, otherwise we can miss doing a dl or
rt pull where we needed one.
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Andrew Morton <akpm@linux-foundation.org>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Link: http://lkml.kernel.org/n/tip-a8k6vvaebtn64nie345kx1je@git.kernel.org
Signed-off-by: Ingo Molnar <mingo@kernel.org>
In order to avoid having to do put/set on a whole cgroup hierarchy
when we context switch, push the put into pick_next_task() so that
both operations are in the same function. Further changes then allow
us to possibly optimize away redundant work.
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1328936700.2476.17.camel@laptop
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Introduces data structures relevant for implementing dynamic
migration of -deadline tasks and the logic for checking if
runqueues are overloaded with -deadline tasks and for choosing
where a task should migrate, when it is the case.
Adds also dynamic migrations to SCHED_DEADLINE, so that tasks can
be moved among CPUs when necessary. It is also possible to bind a
task to a (set of) CPU(s), thus restricting its capability of
migrating, or forbidding migrations at all.
The very same approach used in sched_rt is utilised:
- -deadline tasks are kept into CPU-specific runqueues,
- -deadline tasks are migrated among runqueues to achieve the
following:
* on an M-CPU system the M earliest deadline ready tasks
are always running;
* affinity/cpusets settings of all the -deadline tasks is
always respected.
Therefore, this very special form of "load balancing" is done with
an active method, i.e., the scheduler pushes or pulls tasks between
runqueues when they are woken up and/or (de)scheduled.
IOW, every time a preemption occurs, the descheduled task might be sent
to some other CPU (depending on its deadline) to continue executing
(push). On the other hand, every time a CPU becomes idle, it might pull
the second earliest deadline ready task from some other CPU.
To enforce this, a pull operation is always attempted before taking any
scheduling decision (pre_schedule()), as well as a push one after each
scheduling decision (post_schedule()). In addition, when a task arrives
or wakes up, the best CPU where to resume it is selected taking into
account its affinity mask, the system topology, but also its deadline.
E.g., from the scheduling point of view, the best CPU where to wake
up (and also where to push) a task is the one which is running the task
with the latest deadline among the M executing ones.
In order to facilitate these decisions, per-runqueue "caching" of the
deadlines of the currently running and of the first ready task is used.
Queued but not running tasks are also parked in another rb-tree to
speed-up pushes.
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-5-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
This patch touches the RT group scheduling case.
Functions inc_rt_prio_smp() and dec_rt_prio_smp() change (global) rq's
priority, while rt_rq passed to them may be not the top-level rt_rq.
This is wrong, because changing of priority on a child level does not
guarantee that the priority is the highest all over the rq. So, this
leak makes RT balancing unusable.
The short example: the task having the highest priority among all rq's
RT tasks (no one other task has the same priority) are waking on a
throttle rt_rq. The rq's cpupri is set to the task's priority
equivalent, but real rq->rt.highest_prio.curr is less.
The patch below fixes the problem.
Signed-off-by: Kirill Tkhai <tkhai@yandex.ru>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
CC: Steven Rostedt <rostedt@goodmis.org>
CC: stable@vger.kernel.org
Link: http://lkml.kernel.org/r/49231385567953@web4m.yandex.ru
Signed-off-by: Ingo Molnar <mingo@kernel.org>