In order to level the hierarchy, we need to calculate load based on the
root view. That is, each task's load is in the same unit.
A
/ \
B 1
/ \
2 3
To compute 1's load we do:
weight(1)
--------------
rq_weight(A)
To compute 2's load we do:
weight(2) weight(B)
------------ * -----------
rq_weight(B) rw_weight(A)
This yields load fractions in comparable units.
The consequence is that it changes virtual time. We used to have:
time_{i}
vtime_{i} = ------------
weight_{i}
vtime = \Sum vtime_{i} = time / rq_weight.
But with the new way of load calculation we get that vtime equals time.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
De-couple load-balancing from the rb-trees, so that I can change their
organization.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Currently FAIR_GROUP sched grows the scheduler latency outside of
sysctl_sched_latency, invert this so it stays within.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Implement SMP nice support for the full group hierarchy.
On each load-balance action, compile a sched_domain wide view of the full
task_group tree. We compute the domain wide view when walking down the
hierarchy, and readjust the weights when walking back up.
After collecting and readjusting the domain wide view, we try to balance the
tasks within the task_groups. The current approach is a naively balance each
task group until we've moved the targeted amount of load.
Inspired by Srivatsa Vaddsgiri's previous code and Abhishek Chandra's H-SMP
paper.
XXX: there will be some numerical issues due to the limited nature of
SCHED_LOAD_SCALE wrt to representing a task_groups influence on the
total weight. When the tree is deep enough, or the task weight small
enough, we'll run out of bits.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
CC: Abhishek Chandra <chandra@cs.umn.edu>
CC: Srivatsa Vaddagiri <vatsa@linux.vnet.ibm.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
[rebased for sched-devel/latest]
- Add a new cpuset file, having levels:
sched_relax_domain_level
- Modify partition_sched_domains() and build_sched_domains()
to take attributes parameter passed from cpuset.
- Fill newidle_idx for node domains which currently unused but
might be required if sched_relax_domain_level become higher.
- We can change the default level by boot option 'relax_domain_level='.
Signed-off-by: Hidetoshi Seto <seto.hidetoshi@jp.fujitsu.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
This patch allows tasks and groups to exist in the same cfs_rq. With this
change the CFS group scheduling follows a 1/(M+N) model from a 1/(1+N)
fairness model where M tasks and N groups exist at the cfs_rq level.
[a.p.zijlstra@chello.nl: rt bits and assorted fixes]
Signed-off-by: Dhaval Giani <dhaval@linux.vnet.ibm.com>
Signed-off-by: Srivatsa Vaddagiri <vatsa@linux.vnet.ibm.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Balbir Singh reported:
> 1:mon> t
> [c0000000e7677da0] c000000000067de0 .sys_sched_yield+0x6c/0xbc
> [c0000000e7677e30] c000000000008748 syscall_exit+0x0/0x40
> --- Exception: c01 (System Call) at 00000400001d09e4
> SP (4000664cb10) is in userspace
> 1:mon> r
> cpu 0x1: Vector: 300 (Data Access) at [c0000000e7677aa0]
> pc: c000000000068e50: .yield_task_fair+0x94/0xc4
> lr: c000000000067de0: .sys_sched_yield+0x6c/0xbc
the check that should have avoided that is:
/*
* Are we the only task in the tree?
*/
if (unlikely(rq->load.weight == curr->se.load.weight))
return;
But I guess that overlooks rt tasks, they also increase the load.
So I guess something like this ought to fix it..
Signed-off-by: Ingo Molnar <mingo@elte.hu>
The wakeup buddy logic didn't use the same wakeup granularity logic as the
wakeup preemption did, this might cause the ->next buddy to be selected past
the point where we would have preempted had the task been a single running
instance.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
revert "sched: fix fair sleepers" (e22ecef1d2),
because it is causing audio skipping, see:
http://bugzilla.kernel.org/show_bug.cgi?id=10428
the patch is correct and the real cause of the skipping is not
understood (tracing makes it go away), but time has run out so we'll
revert it and re-try in 2.6.26.
Signed-off-by: Ingo Molnar <mingo@elte.hu>
TREE_AVG and APPROX_AVG are initial task placement policies that have been
disabled for a long while.. time to remove them.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
CC: Srivatsa Vaddagiri <vatsa@linux.vnet.ibm.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
improve affine wakeups. Maintain the 'overlap' metric based on CFS's
sum_exec_runtime - which means the amount of time a task executes
after it wakes up some other task.
Use the 'overlap' for the wakeup decisions: if the 'overlap' is short,
it means there's strong workload coupling between this task and the
woken up task. If the 'overlap' is large then the workload is decoupled
and the scheduler will move them to separate CPUs more easily.
( Also slightly move the preempt_check within try_to_wake_up() - this has
no effect on functionality but allows 'early wakeups' (for still-on-rq
tasks) to be correctly accounted as well.)
Signed-off-by: Ingo Molnar <mingo@elte.hu>
split out the affine-wakeup bits.
No code changed:
kernel/sched.o:
text data bss dec hex filename
42521 2858 232 45611 b22b sched.o.before
42521 2858 232 45611 b22b sched.o.after
md5:
9d76738f1272aa82f0b7affd2f51df6b sched.o.before.asm
09b31c44e9aff8666f72773dc433e2df sched.o.after.asm
(the md5's changed because stack slots changed and some registers
get scheduled by gcc in a different order - but otherwise the before
and after assembly is instruction for instruction equivalent.)
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Use the existing calc_delta_mine() calculation for sched_slice(). This
saves a divide and simplifies the code because we share it with the
other /cfs_rq->load users.
It also improves code size:
text data bss dec hex filename
42659 2740 144 45543 b1e7 sched.o.before
42093 2740 144 44977 afb1 sched.o.after
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Fair sleepers need to scale their latency target down by runqueue
weight. Otherwise busy systems will gain ever larger sleep bonus.
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Currently we schedule to the leftmost task in the runqueue. When the
runtimes are very short because of some server/client ping-pong,
especially in over-saturated workloads, this will cycle through all
tasks trashing the cache.
Reduce cache trashing by keeping dependent tasks together by running
newly woken tasks first. However, by not running the leftmost task first
we could starve tasks because the wakee can gain unlimited runtime.
Therefore we only run the wakee if its within a small
(wakeup_granularity) window of the leftmost task. This preserves
fairness, but does alternate server/client task groups.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Current min_vruntime tracking is incorrect and will cause serious
problems when we don't run the leftmost task for some reason.
min_vruntime does two things; 1) it's used to determine a forward
direction when the u64 vruntime wraps, 2) it's used to track the
leftmost vruntime to position newly enqueued tasks from.
The current logic advances min_vruntime whenever the current task's
vruntime advance. Because the current task may pass the leftmost task
still waiting we're failing the second goal. This causes new tasks to be
placed too far ahead and thus penalizes their runtime.
Fix this by making min_vruntime the min_vruntime of the waiting tasks by
tracking it in enqueue/dequeue, and compare against current's vruntime
to obtain the absolute minimum when placing new tasks.
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Kei Tokunaga reported an interactivity problem when moving tasks
between control groups.
Tasks would retain their old vruntime when moved between groups, this
can cause funny lags. Re-set the vruntime on group move to fit within
the new tree.
Reported-by: Kei Tokunaga <tokunaga.keiich@jp.fujitsu.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Ingo Molnar <mingo@elte.hu>